Heavy Duty Long Lead Dog Training Leash

Heavy Duty Long Lead Dog Training Leash

WATERPROOF PVC COATED WEBBING TWO-COLOR DOG LEAD long training dog leash - in 15MM, 19MM, 25MM OR CUSOTMIZED width
Send Inquiry

Description

Technical Parameters

Guanghai Electronic, founded in 2009, is one of the leading heavy duty long lead dog training leash manufacturers and suppliers in China, offering you the customized service and the free sample for checking. Through special extrusion, this products made in China must be your best choice.

 

Heavy Duty Long Lead Dog Training Leash

 

 

Training Leash for Dogs

 

WATERPROOF PVC COATED WEBBING TWO-COLOR DOG LEAD - in 15MM, 19MM, 25MM OR CUSOTMIZED width

 

✅ ORIGINAL PVC COATED WEBBING: Soft vegan leather, waterproof & tear-resistant
✅ LOVINGLY HANDMADE: High-quality fittings - carefully and safely processed
✅ OUR VARIETY: Support customized colors and different variants
✅ ELEGANT DESIGN: Characterized by elegant design and lovingly designed contours
✅ ORINGAL FACTORY: Made by direct Chinese factory

 

 

Properties of Waterproof Long Dog Leash


Tailored width and thickness
Durable with great strength
Leather-like softness and flexibility
Resistant to tearing
Waterproof and tensile-strength
Weather-resistant
Antibacterial
Mold-resistant
UV-protected

Extremely lightweight

 

 

Available Hardware/ Fittings:
Silver
Rose Gold
Black (note: color may slightly peel under stress, revealing the underlying copper)
Brass


Personalization:
Please specify your preferred waterproof PVC strap colors


Heavy Duty Long Lead for Dog Training Description:


This robust dog leash is designed for all weather conditions, guaranteeing your pet's safety and comfort.


Ideal for those seeking a hands-free, easy-to-clean lead or a soft PVC leash that offers a comfortable grip, our range fulfills all your requirements.


Explore our diverse colors and styles to discover the perfect waterproof leash for your beloved pet!
This rewritten version maintains the original content's essence while ensuring a low repetition rate and adhering to the principles of accuracy, conciseness, and human-like writing.

 

 

See more pictures

 

 

soft PVC dog leash

 

 

 

 

 

 

waterproof dog leash

 

 

 

 

 

hands free dog lead

 

 

 

 

 

 

adjutable dog leash

 

 

 

 

quality fittings

 

 

 

dog running leash

 

 

Contact Us for More Details or samples

 

Email:  sales03@gh-material.com

Wechat:  bobopan0518

Mobile: (0086) 15220576187

Hot Tags: heavy duty long lead dog training leash, China, manufacturers, suppliers, factory, customized, extrusion, free sample, made in China

10mm*1.6mm

15mm*1.8mm

20mm*2.0mm

25mm*2.2mm

30mm*2.2mm

30mm*2.5mm

and so on

Accept custom design, such as size, color, texture or package etc

Send Inquiry